Skip to content

Bump actions/checkout from 5 to 6 #84

Bump actions/checkout from 5 to 6

Bump actions/checkout from 5 to 6 #84

Triggered via pull request November 24, 2025 13:05
Status Failure
Total duration 17s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (8.1)
The process '/usr/bin/bash' failed with exit code 1
test (8.4)
The strategy configuration was canceled because "test._8_1" failed
test (8.4)
The operation was canceled.
test (7.4)
The strategy configuration was canceled because "test._8_1" failed
test (8.2)
The strategy configuration was canceled because "test._8_1" failed
test (8.2)
The operation was canceled.
test (8.3)
The strategy configuration was canceled because "test._8_1" failed
test (8.3)
The operation was canceled.