-
Notifications
You must be signed in to change notification settings - Fork 777
Pull requests: tikv/pd
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
server, cluster: cancel the RaftCluster before the blocking part of step-down
contribution
This PR is from a community contributor.
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11177
opened Aug 25, 2026 by
YuhaoZhang00
Contributor
•
Draft
keyspace: add optional keyspace info metric
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#11176
opened Aug 25, 2026 by
nolouch
Contributor
Loading…
*: delete per-store metrics when a store is tombstoned (#11127)
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11174
opened Aug 24, 2026 by
bufferflies
Contributor
Loading…
*: delete per-store metrics when a store is tombstoned (#11127)
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#11173
opened Aug 24, 2026 by
ti-chi-bot
Member
Loading…
config: persist default store limit for future stores (#10900)
contribution
This PR is from a community contributor.
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#11172
opened Aug 24, 2026 by
ti-chi-bot
Member
Loading…
keyspace: batch removal from TSO keyspace groups
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-triage-completed
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11170
opened Aug 21, 2026 by
rleungx
Member
Loading…
4 of 13 tasks
statistics, schedule: stop republishing metrics for a known-tombstoned store
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11166
opened Aug 20, 2026 by
bufferflies
Contributor
Loading…
client/resource_group: expose RU v1 calculation details
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#11165
opened Aug 19, 2026 by
JmPotato
Member
Loading…
pd-ctl: allow higher v1 store limits for NextGen
contribution
This PR is from a community contributor.
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#11163
opened Aug 19, 2026 by
exit-code-1
Loading…
2 of 10 tasks
mcs, etcdutil: reconcile placement rules after watch compaction
approved
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11161
opened Aug 19, 2026 by
rleungx
Member
Loading…
1 task done
[DNM] test rate-limited Leader return to a restarted TiKV store
contribution
This PR is from a community contributor.
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-linked-issue
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11160
opened Aug 19, 2026 by
exit-code-1
•
Draft
core: return the region tree size if scan all the regions (#9580)
approved
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#11159
opened Aug 18, 2026 by
ti-chi-bot
Member
Loading…
server/cluster: avoid repeated region size scans (#11072)
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#11158
opened Aug 18, 2026 by
ti-chi-bot
Member
Loading…
config: Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
max-store-preparing-time can be set 0s (#10261)
dco-signoff: yes
#11157
opened Aug 18, 2026 by
ti-chi-bot
Member
Loading…
keyspace: make TSO keyspace group auto split configurable
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#11155
opened Aug 17, 2026 by
ystaticy
Contributor
Loading…
*: clear the leader identity before the blocking part of step-down
contribution
This PR is from a community contributor.
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-triage-completed
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11147
opened Aug 14, 2026 by
YuhaoZhang00
Contributor
Loading…
schedule: reject unhealthy stores in scheduling and operator checks
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#11146
opened Aug 14, 2026 by
bufferflies
Contributor
Loading…
server: add microservice metadata cleanup API
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11141
opened Aug 13, 2026 by
rleungx
Member
Loading…
core: scan a copy-on-write snapshot in GetRegionSizeByRange
contribution
This PR is from a community contributor.
dco-signoff: yes
Indicates the PR's author has signed the dco.
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11140
opened Aug 12, 2026 by
vldmit
Loading…
schedulers: fix balance-region churn on near-empty clusters
approved
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#11137
opened Aug 12, 2026 by
bufferflies
Contributor
Loading…
gc: make GC state reads respect request cancellation
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
client/resource_group: enforce one active controller per process
contribution
This PR is from a community contributor.
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11132
opened Aug 11, 2026 by
YuhaoZhang00
Contributor
Loading…
pd-ctl: check target readiness before leader transfer
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#11130
opened Aug 11, 2026 by
JmPotato
Member
Loading…
[DNM] test scale out
contribution
This PR is from a community contributor.
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-linked-issue
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#11128
opened Aug 11, 2026 by
exit-code-1
•
Draft
mcs, tso: fix expected-primary transient marker races
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-triage-completed
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#11123
opened Aug 6, 2026 by
bufferflies
Contributor
Loading…
Previous Next
ProTip!
Type g p on any issue or pull request to go back to the pull request listing page.